Block planning
Block planning is an industrial planning system used for in-house production. A product type can be produced in different variations using the same resources and following the same basic process plan. Block planning supports the production planning and scheduling for this type of system. A block represents a pre-defined sequence of production orders of variable size.
Block planning enables the planning or pre-assignment of resource capacities in the production process for products with specific attributes. It enables a more rational and efficient use of those capacities. Blocks are defined with specific duration and attributes, for example, three days per block on which products are manufactured in various colours.
In piece-oriented sectors such as metal and paper production, upstream planning is often used to define the type of products and which attributes are to be produced. This typically relates to plant needing to be set up in a particular way, when it is inefficient in terms of time and costs to change the set-up more than is necessary.
There is more emphasis, in piece-oriented production, on the resource for which only one production step is executed. It is usual for an order for run over several resources, in which each of the operations could be grouped according to different aspects.
By contrast, the process industry commonly groups several orders together as a ‘campaign’, which is more defined by the material characteristics of the end product. The emphasis is more on an order level, as the process cannot normally be interrupted once it has begun.
[edit] Related articles on Designing Buildings Wiki
- Advanced manufacturing.
- Agile.
- Design for Manufacture and Assembly (DfMA).
- Just-in-time manufacturing.
- Lean construction.
- Line of balance (LOB).
- Logistics management.
- Major cast metal components.
- Metal fabrication.
- Modular buildings.
- Offsite manufacturing.
- Output-based specification.
- Prefabrication.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.